Complexe Enviro Progressive Ltée v. Canada (Transport)
Source text
Complexe Enviro Progressive Ltée v. Canada (Transport) Court (s) Database Federal Court Decisions Date 2018-12-21 Neutral citation 2018 FC 1299 File numbers T-191-17 Notes Digest Decision Content Date: 20181221 Docket: T-191-17 Citation: 2018 FC 1299 [UNREVISED CERTIFIED ENGLISH TRANSLATION] Ottawa, Ontario, December 21, 2018 Present: The Honourable Mr. Justice Gascon BETWEEN: COMPLEXE ENVIRO PROGRESSIVE LTÉE Applicant and THE MINISTER OF TRANSPORT AND THE ATTORNEY GENERAL OF CANADA Respondents JUDGMENT AND REASONS I. Overview [1] The applicant, Complexe Enviro Progressive Ltée [CEPL], is a company that operates a technical landfill site [TLS] on the territory of the city of Terrebonne [Lachenaie TLS]. CEPL is applying to the Court for judicial review of a decision rendered on January 13, 2017, by an officer of the Department of Transport [Minister’s Delegate], Mr. Justin Bourgault [Decision]. According to his Decision, the Minister’s Delegate refused to respond to a formal notice in which CEPL asked the Minister of Transport [Minister] to reconsider a decision he made on October 31, 2016. In this October 2016 decision, the Minister approved, following a public consultation conducted between February and April of the same year, the relocation of the activities of the former airport of the city of Mascouche and the development project of a new aerodrome on a site that is 1.6 kilometers closer to the land where CEPL operates the Lachenaie TLS. [2] In its formal notice sent on D…
Full judgment (source text)
Mirrored from decisions.fct-cf.gc.ca — the linked original is authoritative.
Complexe Enviro Progressive Ltée v. Canada (Transport) Court (s) Database Federal Court Decisions Date 2018-12-21 Neutral citation 2018 FC 1299 File numbers T-191-17 Notes Digest Decision Content Date: 20181221 Docket: T-191-17 Citation: 2018 FC 1299 [UNREVISED CERTIFIED ENGLISH TRANSLATION] Ottawa, Ontario, December 21, 2018 Present: The Honourable Mr. Justice Gascon BETWEEN: COMPLEXE ENVIRO PROGRESSIVE LTÉE Applicant and THE MINISTER OF TRANSPORT AND THE ATTORNEY GENERAL OF CANADA Respondents JUDGMENT AND REASONS I. Overview [1] The applicant, Complexe Enviro Progressive Ltée [CEPL], is a company that operates a technical landfill site [TLS] on the territory of the city of Terrebonne [Lachenaie TLS]. CEPL is applying to the Court for judicial review of a decision rendered on January 13, 2017, by an officer of the Department of Transport [Minister’s Delegate], Mr. Justin Bourgault [Decision]. According to his Decision, the Minister’s Delegate refused to respond to a formal notice in which CEPL asked the Minister of Transport [Minister] to reconsider a decision he made on October 31, 2016. In this October 2016 decision, the Minister approved, following a public consultation conducted between February and April of the same year, the relocation of the activities of the former airport of the city of Mascouche and the development project of a new aerodrome on a site that is 1.6 kilometers closer to the land where CEPL operates the Lachenaie TLS. [2] In its formal notice sent on December 8, 2016, CEPL challenged the decision of the Minister approving the proposed new aerodrome. Incidentally, the arguments developed by CEPL in that formal notice were very similar to those found today in the application for judicial review now before the Court. In its application, CEPL notably seeks orders from the Court declaring the Decision unreasonable and invalid, and enjoining the Minister to reverse his October 2016 decision and to oppose the development of any aerodrome less than eight kilometers from the Lachenaie TLS operated by CEPL. In support of its application, CEPL alleges that by authorizing the development of the new aerodrome, the Minister had renounced his prerogatives in aviation safety, particularly pertaining to the management of the wild birds living near the proposed aerodrome among which there are a large number of gulls (a situation CEPL describes as a [translation] “bird hazard”). CEPL submits that the Decision was also unreasonable because the Minister did not take into account the factual evidence available to him and the direction that his own department had developed with respect to the avian risk and safe distance standards with a TLS. [3] The two respondents, the Minister and the Attorney General of Canada, oppose CEPL’s application. They first note that the appeal lodged by CEPL blithely confuses the January 2017 Decision of the Minister’s Delegate and the Minister’s October 2016 decision. According to the respondents, CEPL did not file an application for judicial review of the Minister’s October 2016 decision and cannot, under the guise of an application for judicial review of the Decision of the Minister’s Delegate, indirectly challenge the decision of the Minister who had allowed the development of the new aerodrome. [4] The respondents also submit that the Minister’s Delegate’s letter merely provided general information about the avian risk and explained how this element had actually been taken into account in the October 2016 decision of the Minister. According to them, the January 2017 Decision expressed the judgment exercised by the Minister’s Delegate to the effect that it was not necessary to seize the Minister of the formal notice sent by CEPL and initiate the process of reconsideration CEPL desired. The respondents argue that this determination is reasonable, that it represents a valid exercise of discretion by the Minister’s Delegate, and that it is all the more justified since CEPL did not submit, in support of its formal notice, any new evidence or claim that it had not already brought to the attention of the Minister under the public consultation that led to the approval of the new aerodrome project. [5] For the following reasons, the application for judicial review filed by CEPL must fail. Indeed, the Decision that is the subject of the appeal lodged by CEPL can only be the conclusion reached in January 2017 by the Minister’s Delegate, to the effect that it was not necessary to seize the Minister of Justice of CEPL’s formal notice and initiate the desired process of reconsideration. In all respects, this Decision of the Minister’s Delegate is defensible in respect of the facts and the law and meets the requirements for justification, transparency and intelligibility, which make a decision reasonable. It falls within a range of possible, acceptable outcomes in the circumstances, and there is therefore nothing to warrant the Court’s intervention. Moreover, to the extent that CEPL’s appeal seeks to indirectly attack the Minister’s October 2016 decision, it is unfounded. II. Context A. Facts [6] At the beginning of 2016, a project for the development of a new aerodrome in the cities of Mascouche and Terrebonne began, to compensate for the imminent cessation of activities at Mascouche Regional Airport, which was scheduled to close in November 2016. Proponents of the new aerodrome were the Mascouche Airport Corporation and the Canadian corporation 9105425 Canada Association [Proponents]. The proposed aerodrome is located within an eight-kilometer radius of the Lachenaie TLS and less than two kilometers from the former Mascouche Airport, which was in operation for more than 40 years. [7] The aerodrome project was strongly opposed by actors from the surrounding community. A dispute concerning the applicability of various Quebec environmental laws and regulations to the aerodrome construction project even came before the Superior Court of Québec, which eventually declared constitutionally inapplicable section 22 of the Environment Quality Act, CQLR, c Q-2 [Environment Quality Act] requiring the obtainment of a certificate of authorization for the establishment of the new aerodrome. [8] Because of the strong local opposition against the proposed new aerodrome, the Minister instituted a public consultation process pursuant to a ministerial order issued in March 2016, in accordance with subsection 4.32(1) of the Aeronautics Act, RSC 1985, c A-2 [Aeronautics Act] (at that time it was section 4.31, of which only the numbering was changed). This ministerial order prohibited, among other things, the development of any aerodrome on the proposed site before the closure of the public consultation and the submission to the Minister of a report on the issues raised by it. More specifically, the ministerial order required that, based on the information gathered during the public consultation, the Minister would give notice as to whether the development of the proposed aerodrome could begin or not. [9] The public consultation ran from February 17 to April 27, 2016, under the direction of the Proponents. The result was a report entitled “Consultations Aérodrome – Relocalisation des activités de l’aéroport de Mascouche et développement et amélioration de l’aérodrome Terrebonne / Mascouche” [Report], which consisted of a summary report and a detailed report. After analyzing the Report and reviewing the various issues related to the project, the Minister decided, on October 31, 2016, to allow the development of the new aerodrome. [10] As part of the public consultation, CEPL presented submissions in an argument dated April 2016. CEPL’s submissions mainly concerned the presence of its facilities near the proposed new aerodrome and the project-related avian risk. The Lachenaie TLS operated by CEPL is located on the territory of the city of Terrebonne, just a few kilometers from the new planned aerodrome, where it meets more than one third of the residual landfill requirements of the Communauté métropolitaine de Montreal [CMM]. CEPL is also planning expansion projects deemed necessary to serve users of its TLS and to continue to meet landfill needs until the end of 2030. [11] CEPL notes in its submissions that it is well established that TLSs attract gulls, which are abundant in the region. However, according to CEPL, despite the success of its control measures taken to prevent gulls from feeding at the Lachenaie TLS (such as the use of falconry, screamer sirens and propane cannons), gulls still live on the periphery of the TLS and are thus directly in line with the proposed runways for the new aerodrome. According to CEPL, the proposed aerodrome would therefore create a danger of collision between avian wildlife and aircraft approaching or taking-off and flying over the Lachenaie TLS for some distance. Now if aircraft were to fall to the ground, they would pose a risk to the safety of TLS workers as well as CEPL installations and equipment. CEPL also identified a series of risks that could arise from the development of a new aerodrome near the TLS, such as (1) the risk of the biogas capture system rupturing and the presence of a potentially explosive environment; (2) the risk of colliding with the power cables of the Hydro-Québec towers on CEPL property; (3) the risk of hitting the [translation] “leachate” treatment system ; (4) the risk of colliding with the biogas treatment system’s wash and refining towers for the production of pipeline-grade green natural gas; and (5) the risk of colliding with the working face where there is truck traffic. B. The Minister’s October 2016 decision [12] The Minister’s October 31, 2016 decision approving the development of the new aerodrome is based on a long “Note for the Minister of Transport” [Note] with several appendices, and which preceded the official signature by the Minister. The purpose of the Note was to recommend to the Minister to inform the Proponents that the development of the proposed aerodrome could commence, and it identifies the key facts underlying the Report. In it we read that many stakeholders (including CEPL) had publicly expressed their displeasure with the project. Among other things, much correspondence had been addressed to Transport Canada [TC] by the mayors of Mascouche and Terrebonne, the Government of Quebec and the CMM to present their concerns about the impact of the project on the environment and noise, the uncertainty of resulting economic gains, and the protection of woodlands and metropolitan forest corridors. The Note indicated that those concerns were at the origin of the ministerial order of March 4, 2016, prohibiting the development of the aerodrome before a public consultation on the project was conducted and the Report reflecting the comments and objections received was issued. [13] The Note recommended that the Minister approve the project, given that, on the one hand, the planned operation could be carried out safely and that, on the other hand, the project would generate economic benefits for the aviation sector in general. The Note also emphasized that this recommendation was consistent with TC’s core mandate of ensuring safety while promoting the advancement of aeronautics in Canada. In the analysis of the social, environmental and economic impact of the aerodrome project, the Note indicated that the project was in the public interest for several reasons, including (1) the more limited impact of the new aerodrome compared to the existing airport less than two kilometers away, as planned air operations would be lower; (2) the ability to operate the aerodrome without compromising aviation safety or that of the public; and (3) the multiple mitigation measures proposed by the Proponents to address the concerns raised by affected communities, both in terms of noise and the environment. [14] In November 2016, the Minister’s Delegate therefore informed the Proponents that the Minister did not oppose the development of the new aerodrome and that, therefore, this development could begin. Unhappy with this decision, CEPL sent, on December 8, 2016, its formal notice to which were added exactly the same observations that it had submitted in April 2016 as part of the public consultation on the development project. The letter of formal notice was addressed to Mr. Bourgault, in his capacity as agent of the Minister, and requested that the Minister reconsider his position and that he oppose the development of any aerodrome less than eight kilometers from the Lachenaie TLS. C. The January 2017 Decision of the Minister’s Delegate [15] In the Decision dated January 13, 2017, addressed to CEPL’s lawyers, the Minister’s Delegate first acknowledged receipt of CEPL’s formal notice. The Delegate then explained that the distances between an aerodrome and waste disposal sites and the other types of places mentioned in TC document “Sharing the Skies: An Aviation Industry Guide to the Management of Wildlife Hazards (TP13549E)” [Guide] are recommendations and not regulations. He noted that the type and scope of such activities vary from place to place, and that there is no hard and fast rule to eliminate their impact. The Minister’s Delegate went on to add that the avian risk purported by CEPL varies according to the type of aircraft using the aerodrome. According to the Delegate, the risk is lower for small and slow aircraft propelled by piston engines, such as those that would be using the planned aerodrome, than it is for fast turbine-powered aircraft. [16] In his letter, the Minister’s Delegate also stated that, when land adjacent to an aerodrome is used in a manner that may attract wildlife, the aerodrome operators are responsible for taking appropriate measures to mitigate negative effects, where necessary, by developing effective management programs. The Delegate also noted that the proposed aerodrome is located less than two kilometers from the former Mascouche Airport which, in more than 40 years of operation, has never experienced problems caused by wildlife activities. Finally, the Minister’s Delegate pointed out that the Minister’s decision resulted from a decision-making process in which, among other things, the proximity of CEPL’s Lachenaie TLS was examined. [17] According to CEPL, the Decision of the Minister’s Delegate highlighted the following points: (1) the fact that the Minister relied on the operators of the proposed aerodrome to take appropriate measures to mitigate the adverse effects of aeronautical activities on avian wildlife; (2) the fact that the decision-making process leading to the Minister’s decision included, among other things, an assessment of the proximity of the Lachenaie TLS; and (3) the fact that the proposed aerodrome would be located less than two kilometers from the former Mascouche Airport where wildlife activities had not caused problems. CEPL added that, through the Minister’s Delegate’s silence on the reconsideration requested by CEPL, the Decision of the Minister’s Delegate constituted in fact a confirmation that the Minister refused this request since ultimately, the Minister did not change his position regarding the development of the proposed aerodrome and did not preclude such development from being less than eight kilometers from the Lachenaie TLS. D. The July 6, 2017, order [18] At the outset, the respondents argued that Mr. Bourgault’s letter of January 13, 2017, was not a “decision” that could be judicially reviewed and that, therefore, there was no certified file to communicate to CEPL. In an order issued on July 6, 2017, Prothonotary Morneau rejected the respondent’s position and instead concluded that the Decision rendered in January 2017 by the Minister’s Delegate [translation] “constitutes and implicitly contains through its silence a decision to refuse the reconsideration requested” (para 15). Furthermore, Prothonotary Morneau also determined that the letter from Mr. Bourgault should be considered as a reviewable decision that may be the subject of an application for judicial review in this Court. Finally, Prothonotary Morneau ordered the respondents to serve any document that was before the decision-maker at the time of the Decision. E. The statutory framework and the relevant provisions [19] The Aeronautics Act is the principal act governing aviation in Canada and is at the heart of this litigation. The purpose of this legislation is to promote aeronautics in Canada, mitigate aviation safety and security risks, and protect travelers. The Minister is responsible for its application as well as for all aeronautics regulations, the main instrument of which is the Canadian Aviation Regulations, SOR/96-433 [Regulations]. So as not to unnecessarily burden the text, the relevant provisions of the Aeronautics Act and the Regulations are reproduced in full in Annex I to these reasons. Subsection 4.32(1), which was used by the Minister in this case, allows the Minister to make a ministerial order if he considers that the development of an aerodrome “is likely to adversely affect aviation safety or is not in the public interest”. Reference may also be made to subsection 4.72(1) which states that the Minister may “make measures respecting aviation security”. Section 4.9 authorizes the Governor in Council to adopt regulations concerning, in particular, the consultations that aerodrome proponents must conduct or the prohibition of the use of airspace or aerodromes. [20] In 2014, amendments were made to the Aeronautics Act to provide the Minister with increased powers to more effectively manage the development of aeronautics in Canada. It was in this context that subsection 4.32(1) appeared, whereby the Minister was given the power to prohibit, by ministerial order, the development or expansion of an aerodrome or any change in its operation if, in the Minister’s opinion, this was likely to adversely affect aviation safety or was not in the public interest. [21] For its part, the Regulations are a voluminous document with several hundred articles, which contains various provisions and requirements aimed among other things at air safety. For example, it defines the difference between an “airport” and an “aerodrome”, an airport being an aerodrome that has received a certificate and is therefore subject to more numerous and stricter requirements. The Regulations specify the obligations of each type of facility, including wildlife planning and management. An entire section of the Regulations deals with wildlife planning and management at “airports” as well as with the requirements for the wildlife management plan that airport operators must develop. [22] In addition to the Aeronautics Act and the Regulations, TC has other regulations, standards and policies that are aimed at promoting aviation safety and security, and mitigating the risks to the air transportation network and the safety of Canadians. TC also publishes other documents such as guides and circulars to inform and assist aerospace stakeholders, the public and other third parties affected by the application of the rules and their understanding. CEPL referred to several of these in its submissions to this Court. I will come back to this later. F. Standard of review [23] Both parties agree that the standard of reasonableness applies in this case since the issues in this application for judicial review are questions of mixed fact and law, and the Decision of the Minister’s Delegate that CEPL seeks to have invalidated was made in the exercise of a discretionary power (Dunsmuir v New Brunswick, 2008 SCC 9, [Dunsmuir] at paras 51, 53; Henri v Canada (Attorney General), 2016 FCA 38 at para 16; Byfield v Canada (Attorney General), 2018 FC 216 at para 9; Rotor Maxx Support Ltd v Canada (Transport), 2018 FC 97 at para 35). [24] Where the standard of review is one of reasonableness, the Court must show deference and refrain from substituting its own opinion for that of the decision-maker, provided that the decision in question is justified, transparent and intelligible, and that it falls into a “range of possible, acceptable outcomes which are defensible in respect of the facts and law” (Dunsmuir para 47). The reasons of a decision are considered reasonable if “the reasons allow the reviewing court to understand why the tribunal made its decision and permit it to determine whether the conclusion is within the range of acceptable outcomes,” (Newfoundland and Labrador Nurses’ Union v Newfoundland and Labrador (Treasury Board), 2011 SCC 62 [Newfoundland Nurses] at para 16). To the extent that the process and results respect the principles of justification, transparency and intelligibility, and that the decision is supported by acceptable evidence that can be justified with respect to the facts and the law, the Court must refrain from substituting their own view of the preferred outcome for the decision (Newfoundland Nurses at para 17). In other words, in the context of a judicial review, the duty of a reviewing court is to ensure that public authorities “do not overreach their lawful powers” (Canada (Canadian Human Rights Commission) v Canada (Attorney General), 2018 SCC 31 [CHRC] at para 40). [25] The standard of reasonableness is one of deference and requires restraint towards the decision-maker because it “is grounded in the legislature’s choice to give a specialized tribunal responsibility for administering the statutory provisions, and the expertise of the tribunal in so doing” (Edmonton (City) v Edmonton East (Capilano) Shopping Centres Ltd, 2016 SCC 47 at para 33; CHRC at para 40; Dunsmuir at para 49). In reviewing the reasonableness of a decision, where a question of mixed fact and law is directly within the expertise of a decision-maker, the “court’s task is to supervise the tribunal’s approach in the context of the decision as a whole. Its role is not to impose an approach of its own choosing” (CHRC para 57). In this case, the Aeronautics Act is the main law that the Minister (and by extension, his Delegate) must apply and implement; its interpretation and application therefore fall within the core fundamental area of expertise of the Minister. In such circumstances, the Court must show great deference to the factual findings and evaluation of the evidence made by the Minister and his Delegate. [26] The question before the Court is therefore not whether another result or another interpretation could have been possible. The question is whether the conclusion drawn by the Minister’s Delegate falls within the range of possible acceptable outcomes in the circumstances. The fact that there might be other plausible interpretations and that one of them might support a more favourable outcome to CEPL does not imply that the one determined by the Minister’s Delegate was unreasonable. In fact, reasonableness review recognizes the legitimacy of multiple possible outcomes, even where they are not the court’s preferred solution (CHRC, para 55). [27] Moreover, the Decision of the Minister’s Delegate is the manifestation of an essentially administrative government function exercised in the normal course of TC’s activities, namely, a determination that the issue raised by CEPL did not reach the threshold of an issue to be submitted to the Minister. As the respondents rightly pointed out, as an act of discretion, the decision not to refer the CEPL request for reconsideration to the Minister can be considered unreasonable only if the author acted contrary to the spirit of the law, relied on irrelevant considerations, or acted in bad faith or arbitrarily (Comeau’s Sea Foods Ltd v Canada) (Minister of Fisheries and Oceans), [1997] 1 SCR 12 at para 36; Maple Lodge Farms v Government of Canada, [1982] 2 SCR 2 [Maple Lodge Farms] at pp 7-8; Waycobah First Nation v Canada (Attorney General), 2011 FCA 191 [Waycobah] at paras 12, 19). III. Analysis [28] CEPL submits that the Decision of the Minister’s Delegate was unreasonable and must be set aside by the Court, for two reasons. First, by allowing the new aerodrome project to proceed, the Minister renounced his prerogatives in aviation safety and, more specifically, the management of avian wildlife near the projected aerodrome. According to CEPL, the regulations currently in place are insufficient to ensure aviation safety given the risks posed by the bird hazard at the Lachenaie TLS and, by simply allowing the operators of the aerodrome to mitigate these risks by the means they deem effective, the Minister refused to exercise the power to take “security measures” under subsection 4.72(1) of the Aeronautics Act, more specifically with respect to the management of avian wildlife. Second, CEPL submits that the Decision was also unreasonable because the Minister did not take into account the factual evidence available to him and the directions of his own department with respect to the safe distance standards with respect to a TLS. [29] I do not agree and I do not share CEPL’s claims. The exercise by the Minister’s Delegate of his administrative and discretionary power not to submit CEPL’s notice to the Minister for decision is based on a particular factual context that does not involve questions of law. Under the standard of reasonableness, the Court can only intervene if the Minister’s Delegate reached an unacceptable conclusion that is not defensible in respect of the facts and law. That is not the case here. A. The decision in question is that of the Minister’s Delegate [30] I pause to note that, as confirmed by Prothonotary Morneau in his July 2017 order, the decision that is the subject of this judicial review is the January 2017 Decision of the Minister’s Delegate refusing to bring the request for reconsideration made by CEPL in its formal notice of December 2016 before the Minister. Despite the respondents’ initial contentions that the Decision was simply a [translation] “courtesy letter”, Prothonotary Morneau decided the issue in his order: the January 2017 letter should be seen as the reviewable decision at the heart of CEPL’s application for judicial review. [31] Since it is the Decision of the Minister’s Delegate that is the subject of CEPL’s application, only the conclusion and the reasons therein are at issue. Thus, the present judicial review is not about the Minister’s October 2016 decision by which the Minister authorized the project of a new aerodrome in Mascouche/Terrebonne. It is important to emphasize this because, in both its written and oral submissions and representations to this Court, CEPL confuses the two decisions. In fact, in support of its claims that the Decision of the Minister’s Delegate was unreasonable, CEPL often refers to the October 31, 2016, decision of the Minister, thus indirectly challenging that decision. Moreover, in addition to its conclusions on the unreasonableness of the Decision of the Minister’s Delegate, CEPL also asks that the Court order the Minister to reconsider the position expressed in his October 2016 decision regarding the project to develop an aerodrome; that it direct the Minister to make an order under subsection 4.32(1) of the Aeronautics Act to prohibit the development of the aerodrome; and that it direct the Minister to oppose the development of any aerodrome within eight kilometers of the Lachenaie TLS. Thus, when CEPL complains that, despite its representations and its formal notice, the Minister refused and continues to refuse to intervene to prohibit the development of the proposed aerodrome and/or any other aerodrome at a minimum distance from the Lachenaie TLS, it is clear that CEPL is not targeting so much the January 2017 Decision of the Minister’s Delegate with regard to its formal notice as it is the entire decision-making process leading up to the Minister’s decision at the end of October 2016. [32] Yet this is not the issue of CEPL’s application for judicial review. It is clear that CEPL cannot, by means of a proceeding against the Decision of the Minister’s Delegate, challenge the Minister’s preliminary decision rendered in October 2016 and seek remedies against this decision. CEPL did not seek judicial review of this ministerial decision and instead opted to submit a request for reconsideration of that decision. [33] In any event, if the subject of CEPL’s application for judicial review and the decision leading to it were really the Minister’s October 2016 decision, that application would in any event have been statute-barred under the Federal Courts Act, RSC 1985, c F-7 [FCA]. Indeed, CEPL was aware of the Minister’s decision since the beginning of November 2016, more than three months before it filed its application for judicial review on February 10, 2017. Subsection 18.1(2) of the FCA is clear: an application for judicial review must be made within 30 days after the time the decision under review was first communicated. I would add that no request for an extension of time was made by CEPL regarding the Minister’s October 2016 decision and the decision-making process leading to it. [34] Admittedly, in its December 2016 formal notice, CEPL argued that the Minister’s October 2016 decision completely ignored the arguments made by CEPL, without any justification or explanation. In response, the Minister’s Delegate attempted, in the January 2017 Decision, to clarify the process leading up to the October 2016 decision, writing (1) that the Guide contains only recommendations and not regulations; (2) that the avian risk varies according to the context and that the risk was comparatively lower in this case; (3) that the aerodrome operators would be responsible for establishing avian risk mitigation programs, as required; (4) that, moreover, the proximity of the planned site to the Lachenaie TLS had already been taken into consideration in the decision-making process; and (5) that the proposed site was very close to the old site, which had never seen an incident of the type alleged by CEPL. In doing so, I agree that the Minister’s Delegate discussed the context that led to the Minister’s positive recommendation. But it is not the Minister’s initial decision that is the subject of the application for judicial review filed by CEPL. B. The Decision of the Minister’s Delegate reflects the statutory framework in place and is reasonable [35] It appears from the Decision that the Minister’s Delegate implicitly determined that it was not necessary to refer CEPL’s formal notice to the Minister and trigger the process of reconsideration sought by CEPL. The Minister, as I recall, was not seized as such of the request for reconsideration by CEPL, did not make a determination on this request and of course did not reconsider his October 2016 decision. For the reasons that follow, I am satisfied that there is nothing in the record to conclude that by rendering his January 2017 Decision, the Minister’s Delegate exercised his discretion unreasonably. [36] On the one hand, the statutory framework in place imposes no obligation on the Minister to initiate a reconsideration procedure in respect of a decision related to a ministerial order made under subsection 4.32(1) of the Aeronautics Act, nor does it establish any particular process to be followed in doing so. Similarly, the Aeronautics Act also does not provide the right for CEPL to request a reconsideration of the Minister’s decision rendered on October 31, 2016. CEPL, in fact, did not refer the Court to any provision supporting or suggesting the opposite. [37] This situation is different from what the Aeronautics Act provides in other provisions. For example, section 7 deals with threats to aviation safety or security, and subsection 7(1) provides that the Minister may suspend a Canadian aviation document on the grounds that an immediate threat to aviation safety or security exists or is likely to occur. Subsection 7(3) expressly provides for a review of such decisions by the Minister. However, such a remedy does not exist for decisions relating to ministerial orders made under subsection 4.32(1) of the Aeronautics Act, as is the case here with the Minister’s decision. [38] Since CEPL did not have a right to a reconsideration or re-examination of the Minister’s decision taken in October 2016 allowing the development of the proposed aerodrome, the Minister’s Delegate did not have to seize the Minister of CEPL’s request for reconsideration or recommend a re-examination. It is the responsibility of TC officials, such as the Minister’s Delegate, to determine the advisability of forwarding a request such as CEPL’s to the Minister. The Minister’s Delegate thus exercises his discretion when assessing a request for reconsideration and determining whether to proceed with a re-examination or to refuse it (Borovic v Canada (Citizenship and Immigration), 2016 FC 939 at paras 15, 17). In the case of CEPL, the Minister’s Delegate exercised his discretion in accordance with the Aeronautics Act by deciding that, having regard to all the circumstances, there was no need to exercise his discretion to recommend the reconsideration sought by CEPL. In the absence of a legal obligation imposing a duty to reconsider the decision made under subsection 4.32(1) of the Aeronautics Act, it is clear that the Minister’s Delegate’s decision not to refer the matter to the Minister is a reasonable exercise of his discretion. [39] I can understand CEPL’s concerns about the bird hazard, but that does not make the Decision unreasonable or justify the intervention of the Court. Nothing in the record shows or even suggests that the Minister’s Delegate acted unreasonably or arbitrarily or relied on irrelevant considerations in concluding as he did. [40] On the other hand, there is no factual background or circumstance that could have created an obligation for the Minister to reconsider his October 2016 decision, or that could have motivated the Minister’s Delegate to refer CEPL’s request to the Minister. It is undeniable that, in this case, CEPL had ample opportunity to put forward its point of view and its submissions on the bird hazard during the public consultation carried out following the ministerial order. As the Report and the Note eloquently demonstrate, CEPL’s submissions and representations were considered by the Minister in the decision-making process. Nothing suggests or implies that those representations were not considered by the Minister in his decision. CEPL did not submit any new evidence or facts in support of the request for reconsideration sent to the Minister’s Delegate. Incidentally, the submissions appended to its formal notice of December 8, 2016, are completely identical to those that CEPL had already submitted in April 2016 and brought to the attention of the Minister as part of the public consultation process that led to the October 31, 2016, decision. Absolutely nothing was added. [41] Given the absence of new elements submitted by CEPL, there is no basis for concluding that in rendering his Decision, the Minister’s Delegate exercised his discretion unreasonably in light of the factual context in question. Also, both the statutory framework and the factual context demonstrate that the Decision of the Minister’s Delegate is reasonable and falls within the spectrum of possible outcomes that are acceptable based on the facts and law. C. The grounds invoked by CEPL do not establish that the Decision of the Minister’s Delegate is unreasonable [42] I now turn to the two arguments put forward by CEPL to convince the Court to declare the Decision of the Minister’s Delegate unreasonable and invalid. [43] First, the two criticisms made by CEPL do not seem directed at the January 13, 2017, letter from the Minister’s Delegate, although CEPL presents them in its submissions as elements that would justify invalidating this Decision. In fact, the formal notice sent by CEPL and to which the Minister’s Delegate is responding in his Decision asks the Minister to reconsider his October 2016 decision and to prohibit the development of the planned aerodrome. CEPL’s application for judicial review thus reveals that in fact CEPL’s application possesses all the attributes of a disguised attack on the Minister’s decision, under the guise of a request for reconsideration. CEPL’s grievances concerning the renunciation of the Minister’s prerogatives with respect to aviation safety and the failure to take into account factual elements and departmental guidelines target undoubtedly and above all the merits of the Minister’s October 2016 decision. That said, I recognize that in his Decision, the Minister’s Delegate provided some general information about avian risk and explained how this element was taken into account in the context of the Minister’s decision. This could be seen as a certain overlap between the reasons for the Minister’s October 2016 decision and those underlying the January 2017 Decision of the Minister’s Delegate. And, to that extent, the arguments put forward by CEPL could be read as also targeting the Decision of the Minister’s Delegate. [44] Even if I were to give CEPL the benefit of the doubt and I considered the arguments put forward by CEPL as more than the indirect challenge to the Minister’s decision that they appear to be, but as grounds in support of its remedy against the Minister’s Delegate’s Decision, I am not satisfied that they are sufficient to show that the Decision is unreasonable and that they justify the intervention of the Court. (1) There was no renunciation of powers [45] CEPL first alleges that the Minister acted unlawfully by renouncing his prerogatives with respect to the safety and security of aeronautical activities, including his power to make measures respecting aviation security under subsection 4.72(1) of the Aeronautics Act. According to CEPL, avian wildlife poses a clear risk to aviation safety given the location of the aerodrome planned near the Lachenaie TLS, and no concrete action has been put forward by the Minister to deal with it. CEPL criticizes the Minister for relying on the operators of the planned aerodrome to take appropriate measures to mitigate the avian risk through [translation] “management programs” and argues that this constitutes an unreasonable renunciation of his powers. CEPL recognizes that the Regulations provide that only operators of an “airport”, not an “aerodrome”, are required to develop and implement a wildlife management plan. But, according to CEPL, this reflects the fact that, given the silence of the Regulations, the operators of the proposed aerodrome thus have and will have no obligation to develop a management plan once the aerodrome has been completed, and that the Minister therefore cannot simply rely on their good will. [46] CEPL notes in particular the excerpt of the January 2017 Decision in which the Minister’s Delegate affirms that [translation] “the operators of the aerodrome are responsible for taking appropriate measures to mitigate the negative effects where necessary by developing effective management programs”. According to CEPL, it is unreasonable that the operators of the proposed aerodrome do not have a more specific obligation to develop such a management plan. CEPL submits that the Minister must instead use the powers vested in him and must issue a ministerial order under subsection 4.32(1) of the Aeronautics Act to prohibit the development of the proposed aerodrome. CEPL adds that, in the circumstances, this way of dealing with the risk after the fact and leaving it to the eventual operators of the aerodrome constitutes an unlawful renunciation of the Minister’s duty. Relying, in particular, on the decision in St-Damien (Municipalité de) c Québec (Ministre du Développement durable, de l’Environnement et des Parcs), 2012 QCCS 2897 [St-Damien] at paragraphs 434 and 437, CEPL argues that this conduct of the Minister is [translation] “completely unreasonable and contrary to the publ
Source: decisions.fct-cf.gc.ca
Klouvi c. Canada (Procureur général)
2024 CAF 80